HOMEPostContact Us
Posted January 02. 2014 2:03PM

Wilton: Engineering study for dam fall through cracks

Click headline or here to open angled item
WILTON — A lack of clarity in responsibility seems to be behind a delay in an engineering study for the New Reservoir Dam. In 2012, the town was notified by the N.H. Department of Environmental Services that an engineering study was required to address deficiencies in the dam.


1050,1012,1426