HOMEPostContact Us
Posted September 26. 2013 12:46PM

Report: Safety of Windsor dam below standard

Click headline or here to open angled item
Windsor ó A consulting engineer hired to analyze the Ascutney Mill Dam that forms Kennedy Pond said that the damís overall stability and spillway capacity are both below safety standards and higher spillway flows raise the risk on the buttress shell.


1026,1012,1016,1428