Report: Safety of Windsor dam below standard

Windsor ó A consulting engineer hired to analyze the Ascutney Mill Dam that forms Kennedy Pond said that the damís overall stability and spillway capacity are both below safety standards and higher spillway flows raise the risk on the buttress shell.
CLICK TO VIEW THE SOURCE MATERIAL