HOMEPostContact Us
Posted September 26. 2013 12:49PM

Gilford coal tar removal will take 2 years, require 12 to 16 truckloads a day

Click headline or here to open angled item
The tar was dumped into pits on lower Liberty Hill and then covered over in the 1950s, after a fire at a gas plant along the Winnipesuakee River in Laconia.


1026,1285