HOMEPostContact Us
Posted July 05. 2013 11:42AM

Road salt certification program seen as way to keep I-93 project on track and eight-lanes wide

Click headline or here to open angled item
If the overall chloride levels aren’t brought under control, the state could be forced to take other action, such as scaling back the I-93 project to six lanes instead of eight to reduce the road surface that would require salting during winter storms.


1026,1050,1550,1347,1359,1360,1372,1377