All Sections
Welcome guest, you have 2 views left. | Register | Sign In

Sarah Long Bridge opens ahead of schedule

PORTSMOUTH - The Sarah Mildred Long bridge was opened to vehicular traffic around 11:30 a.m. Monday, almost two weeks ahead of schedule.

The ailing middle bridge connecting Portsmouth and Kittery, Maine, was damaged April 1 when a tanker came loose from the state pier and collided with it.

The bridge had been closed to vehicular traffic since then and was not scheduled to open until Memorial Day weekend.

Incidental work will continue to be done to complete the repair.

The bridge is scheduled to be replaced by 2017.


Follow us on Twitter Follow us on Facebook Follow our RSS feed
Union Leader app for Apple iPad or Android *
Click to download from Apple Apps StoreClick to download from Android Marketplace
* e-Edition subscription required

More Public Safety

NH Angle - Public Safety