Home » News » Education
July 11. 2012 10:58PM
Workers ahead of schedule on Derry school's new gym floor
DERRY — The replacement of the West Running Brook Middle School gym floor is moving along ahead of schedule, according to Jane Simard, the district’s finance director.
Work on the new floor began on June 18, the first Monday after school closed for the year, and should be ready well before the opening of the new school year in September.
Earlier this year, the floor was damaged when a hot-water pipe burst. Rather than just replacing the damaged portion of the floor, the School Board approved a plan for a new gym floor for $130,000, $85,000 of which will be covered by the district’s insurance policy.
Several board members said that with the insurance money to cover two-thirds of the cost, it made sense to move forward with replacing the entire gym floor.
Simard said a new floor would last longer and also would use material that has more of a spring to it and would be less liable to suffer water damage.
She praised the job the contractors, Danaher Flooring of Vermont, have done thus far.
“They have been here Mondays through Fridays from 7 a.m. to 6 p.m. and on Saturdays from 7 a.m. to 2 p.m.,” Simard said. “They have worked really hard in the heat and have been doing a great job.”
The initial plan had the contractors removing the bleachers from the gym, but Simard said they have been able to move the bleachers back and forth within the gym to remove the existing flooring and install the sub-flooring and maple top flooring.
Although the floor’s finish will be the same as the previous floor, Simard said the new gym floor will more readily be able to expand if water does get into it without being damaged, preventing the type of incident that damaged the gym earlier in the year.
Once completed, the maintenance of the floor will not significantly change, although Simard said the maintenance staff is looking to cover the floor more frequently with matting to preserve its integrity.
According to the contractors, once the work is complete, it will have to sit for one week before it can be used.
“Because the project is ahead of schedule, we’ll probably be able to leave it vacant for more than a week,” Simard said.
Adam Swift may be reached at aswift@newstote.com.
Work on the new floor began on June 18, the first Monday after school closed for the year, and should be ready well before the opening of the new school year in September.
Earlier this year, the floor was damaged when a hot-water pipe burst. Rather than just replacing the damaged portion of the floor, the School Board approved a plan for a new gym floor for $130,000, $85,000 of which will be covered by the district’s insurance policy.
Several board members said that with the insurance money to cover two-thirds of the cost, it made sense to move forward with replacing the entire gym floor.
Simard said a new floor would last longer and also would use material that has more of a spring to it and would be less liable to suffer water damage.
She praised the job the contractors, Danaher Flooring of Vermont, have done thus far.
“They have been here Mondays through Fridays from 7 a.m. to 6 p.m. and on Saturdays from 7 a.m. to 2 p.m.,” Simard said. “They have worked really hard in the heat and have been doing a great job.”
The initial plan had the contractors removing the bleachers from the gym, but Simard said they have been able to move the bleachers back and forth within the gym to remove the existing flooring and install the sub-flooring and maple top flooring.
Although the floor’s finish will be the same as the previous floor, Simard said the new gym floor will more readily be able to expand if water does get into it without being damaged, preventing the type of incident that damaged the gym earlier in the year.
Once completed, the maintenance of the floor will not significantly change, although Simard said the maintenance staff is looking to cover the floor more frequently with matting to preserve its integrity.
According to the contractors, once the work is complete, it will have to sit for one week before it can be used.
“Because the project is ahead of schedule, we’ll probably be able to leave it vacant for more than a week,” Simard said.
- - - - - - - -
Adam Swift may be reached at aswift@newstote.com.
- Littleton shelter cuts adoption fee for black cats - 0
- Rescue group searches Merrimack area for dog injured in coyote trap - 6
- This week's Rare Bird Alert - 0
- Stuck duck just part of a town hall tradition in Epping - 1
- Two more adult male ospreys tagged by Squam Lake researchers - 0
- Epping 9-year-old eager to show off his new calf - 1
- This week's Rare Bird Alert - 0
- ‘We are not starving cats,’ Epping official says after vote to allow shelter, food - 26
- Animal Rescue League names Volunteer of Year - 0
This Week's Rare Bird Alert
READER COMMENTS: 0- Road to Recovery helps America's heroes - 0
- Valenti Modified Series back at it - 0
- Seabrook scores in OT to give Blackhawks win, series tie - 0
- Apology issued for naming of Boston bomber as a victim of gun violence at Concord rally - 23
- Hellickson, Rays handcuff Red Sox - 0
- Celtics' Rivers, Ainge meet to clear air - 0
- Fisher Cats drop second straight - 0
- Troubles mount for Patriots' Hernandez - 0
- Central High student says he was knocked unconscious; police investigate racial motive - 0
Russian national indicted over phony debit, credit cards
READER COMMENTS: 0- Should schools do more to police food and beverages consumed at school?
- Yes
- 29%
- No
- 71%
- Total Votes: 112



